精品久久久久久国产偷窥-丝袜亚洲综合-国产青青草-一区二区三区精品-性色生活片-九九九亚洲-日韩av不卡一区-欧美天天视频-国产精品高潮呻-国产老太一性一交一乱-91亚洲免费-亚洲欧美在线精品-国产视频资源-国产精品一区波多野结衣-丁香婷婷综合激情五月色-亚洲aⅴ无码专区在线观看-国内精品国内精品自线在拍-九九热这里有精品-开心色婷婷色五月激情-国产传媒视频在线

新聞資訊
公司新聞
展會(huì)資訊
Company News

當(dāng)前位置:首頁(yè) - 新聞資訊 - Company News

Excavator crawler plate, roller, roller, guide wheel and other accessories loading and unloading
發(fā)布日期: 2019-10-15    瀏覽次數(shù): 1546    新聞編輯: 
First, the track plate
Disassembly
1. Move the track shoe until the kingpin moves over the guide wheel and place the block in the appropriate position.
2. Relax the track shoe. When the grease valve is released and the track shoe is still not relaxed, move the excavator back and forth.
3. Remove the kingpin with a suitable tool.
4. Slowly move the excavator in the opposite direction so that the track shoe assembly is laid flat on the ground. The excavator is jacked up and the lower part is supported by wooden blocks. When the track shoes are laid on the floor, the operator should not be near the sprocket to avoid bruising.
Installation
Install the belt in the reverse order of removal and adjust the tension of the track.


Second, the support wheel
Disassembly
1. Loosen the track shoe
2. Lift the track shoe to a sufficient height to remove the roller.
3. Loosen the lock nut.
4. Use a screwdriver to remove the bracket from the inside out, and then remove the roller assembly, the mass is 21kg.


Third, the roller
Disassembly
1. Loosen the track shoe.
2. Use the working device to support the crawler frame to be disassembled at one end.
3. Remove the mounting bolts and take out the roller, the mass is 39.3kg.


Fourth, the guide wheel
Disassembly
1. Remove the track shoe. See the chapter on disassembling the track shoe for details.
2. Lift the tension spring and remove the guide wheel and tension spring from the crawler frame with a crowbar. The mass is 270kg.
3. Remove the bolts and washers and separate the guide wheel from the tension spring.
Installation
Make sure that the protruding portion of the tension cylinder rod is installed in the cylinder of the track frame.

首頁(yè)    /    關(guān)于我們    /    新聞動(dòng)態(tài)    /    產(chǎn)品中心    /    服務(wù)中心    /    人才招聘    /    聯(lián)系我們

銷(xiāo)售熱線(xiàn):+86-18160963591
地址:福建省泉州市南安霞美濱江機(jī)械產(chǎn)業(yè)基地濱江大道6號(hào) / 郵編:362333
電話(huà):0595-86329666 / 傳真:0595-86329667
郵箱:wxz@wan-xing.cn

網(wǎng)站二維碼

微信二維碼

版權(quán)所有:2019-2022 泉州市萬(wàn)興重工設(shè)備有限公司 閩ICP備19018302號(hào)-1 技術(shù)支持:科偉網(wǎng)絡(luò)